
I think I watched the construction of this crane for almost an hour a few days ago. Coolest thing to happen to Charlottesville in a long time. Isn’t this the biggest object in Charlottesville, ever?
I put a slideshow after the break.
Related posts:
- Better Daytime Crane Pictures
- Second Crane at Landmark Construction Site
- Was it a bad idea to post the crane pictures?

Great slide show Kyle, but I am docking you an hours pay and issuing you with an official warning. Now get back to work you slacker.
Don’t even waste your time Flooze. Kyle tried to take a sick day to go watch the crane, and danpri fired him.
The crane is being installed to speed the delivery of Everyone’s Favorite Hot Dog(TM).
Danpri had every right to fire him. I took over his job. I am a woman – so I do it better.
@5: And for less money.
Definitely not the biggest object in C’ville.
you’re tellin me
That’s what she said.
i’ve seen bigger
That there is uh biggun’! LOL!
Sweep the leg johnny!
But sensei…
Took me a minute, but I got it. I need smart pills around you, mister yo.
Those pictures are very, very cool. Thanks for posting them. I’m bitterly jealous that I didn’t see it myself. That orange crane is MONSTROUS.
And the whole thing has a faint air of a particularly large ride being assembled at a midway, like the Albemarle County Fair.
@12 – Strike First, Strike Hard, No Mercy!